San Jose Creek Water Reclamation Plant

Construction of additional capacity and redundancy for the Return Activated Sludge 19,500 MGD pump station to support the secondary treatment process. To ensure continuous operation, a new Return Activated Sludge pump station was constructed with the existing pump station in operation. The project included construction of a new wet well, replacement of existing pumping equipment and associated piping, and upgrades to ancillary electrical and control systems.

 

Owner: Sanitation District 2 of Los Angeles
Location: Whittier, CA
Construction Cost: $12M
Market: Wastewater