Santan Freeway, Frye to Power Rd.

The project included construction of a 148 MGD stormwater pump station complete in place. Work performed included all excavation and backfilling; masonry; concrete and reinforcing steel; outlet pipe section (72-inch) and dissipater structure; pumps and controls; natural gas engine drives; hatches; plumbing work; and electrical and mechanical work.

 

Owner: Arizona Department of Transportation
Location: Gilbert, AZ
Construction Cost: $63.4M
Market: Water