The Challenge

Installation of Greenfield Road reclaimed water mains from Pecos Road to the Greenfield Wastewater Reclamation Plant (GWRP), and reclaimed water mains from the GWRP to the South Recharge Site. The project included installing approximately 0.9 miles of 30-inch ductile iron pipe reclaimed water line, one mile of 72-inch tape-wrapped steel cylinder reclaimed water main, and an outfall structure at the East Maricopa Floodway.