The Challenge

Construction of additional capacity and redundancy for the Return Activated Sludge 19,500 MGD pump station to support the secondary treatment process. To ensure continuous operation, a new Return Activated Sludge pump station was constructed with the existing pump station in operation. The project included the construction of a new wet well, replacement of existing pumping equipment and associated piping, and upgrades to ancillary electrical and control systems.