The Challenge
The intent of the project is to realign the Ellsworth Channel, which includes; rebuilding a section of the Powerline Floodway, building a new confluence, building a new section of the Ellsworth Channel, backfilling portions of the old Ellsworth Channel alignment, and construct Hawes Road south of Ray Road and over the Powerline Floodway via a bridge to include pathways for both wet and dry utilities as shown in the plans.