The Challenge
Construction of 2.2 miles of the six-lane new urban divided freeway with collector-distributor roads between University Drive and Broadway Road. The work included roadway excavation, embankment, aggregate base, concrete pavement with asphaltic rubber friction course, three cast-in-place box girder bridges, and 13 reinforced concrete box culverts.